Drying and Heating of Refractory Lining in CFB Boilers of Unit 8 at Estonia Power Plant
- Source
- riigihanked.riik.ee
- Status
- Open
- Buyer
- Enefit Power OÜ
- Submission deadline
- Closed
- CPV codes
- 50530000Repair and maintenance services of machinery
- 71300000Engineering services
AI Overview
Description
The purpose of the procurement is the Drying and Heating of Refractory Lining in CFB Boilers of Unit 8 at Estonia Power Plant, in accordance with the legislation of the Republic of Estonia and the terms and conditions set out in the procurement documents.
For more information, please refer to the procurement documents.
Details
- Published at
- Reference number
- 309092
- Procurement ID
- 10179346
Documents (18)
- Form 2. List of ContractsForm 2 List of Contracts.docx
- Form 1. Price offer formForm 1 Price offer form.xlsx
- Kõrvaldamise alused ja kvalifitseerimistingimused309092_korvaldamise_alused_ja_kvalifitseerimistingimused.pdf
- Vastavustingimused309092_vastavustingimused.pdf
- Hindamiskriteeriumid ja hinnatavad näitajad309092_hindamiskriteeriumid.pdf
- Guidelines for biddersGUIDELINES FOR BIDDERS.docx
- Draft Contract with annexes309092_Draft Contract.zip
- Draft Contract with annexes309092_Draft Contract.zip309092_Draft Contract.docx
- Draft Contract with annexes309092_Draft Contract.zipAppendix 1. General Terms and Conditions of Contracts for Services.pdf
- Draft Contract with annexes309092_Draft Contract.zipAppendix 2. Distribution of Responsibilities and Obligations of Employers.pdf
- Draft Contract with annexes309092_Draft Contract.zipEesti Energia Group´s Code of Ethics for Partners.pdf
- Draft Contract with annexes309092_Draft Contract.zipOccupational Health and Safety Requirements for Contractual Partners of Eesti Energia.pdf
- Draft Contract with annexes309092_Draft Contract.zipPrinciples for Processing the Personal Data of Eesti Energia Group's Partners.pdf
- Technical specification with annexes309092_Technical specification.zip
- Technical specification with annexes309092_Technical specification.zip309092_Technical specification.docx
- Technical specification with annexes309092_Technical specification.zipTS Annex_1. Dryout Protection shields of Lift Leg in Furnace.pdf
- Technical specification with annexes309092_Technical specification.zipTS Annex_2. Boiler Refractory Drawing_Protection shield of Lift Leg .pdf
- Technical specification with annexes309092_Technical specification.zipTS Annex_3. Datasheet of material.pdf